top of page

SPEED OF CONSTRUCTION

Aegicem has simplified every step of construction and obtained efficiencies that greatly reduce the time to complete a project. The entire process of construction from setting footings to the final walk through, is designed to be completed in under 30 days.

Footing System

Aegicem's foundation system consists of a set of adjustable precast footing molds, footing beams and foundation panels. The footing molds and beams are delivered and assembled on site, adjusted for level, and poured in place.

  • Takes a single day to set, level, and pour footings

  • Fits together integrally with entire structural system

  • Once the foundation and columns are cemented they become a precision guide and support system for subsequent structural elements

Foundation Panels

Aegicem's slab consists of reinforced concrete panels that are placed on top of the footings prior to concrete being poured into the space between the ground and the foundation panels. These panels ensure a perfect foundation pour every time, in all weather conditions. Unlike traditional foundation curing, Aegicem's foundation panels eliminate the need for an expensive sealing process, water submersion, or continuous wet cover to obtain full compressive strength.

  • 1 day to complete vs a minimum of 21 days for a traditional slab or any other slab system available

  • Able to complete slab with only 2 people

  • Eliminates the need for screeding, floating, and troweling

Installing windows in a home is a time consuming process, and requires a high degree of skill to execute properly. Aegicem's window packages are made of cementitious composite that integrate the sill, casing, stool, interior/exterior trim, and protective shutters, and is easy to slide in place.

  • A Window Package is designed to be installed in approximately 10 minutes

  • Designed to complete a 3000 sqft home in 5 hours or less

  • Packages fit perfectly into the exterior window panels, eliminating the need for framing, measuring, leveling, or shimming

Window & Door
Packages

Structural exterior walls are precast components that can come with a wide array of finishes from the factory. For fire prone regions, our completely fire proof refractory veneer can be applied quickly to the wall panel surface.

  • All exterior wall panels can be set in place and bolted in a matter of hours

  • The interior side is quickly finished by applying a ready made interior wall panel

Exterior Walls

Roof System

A traditional roof system consists of setting trusses, applying sheathing, covering the entire roof with felt paper, valley flashing, roofing, capping, drip edge, soffit, fascia, and boxing. These are all physically challenging, dangerous, and complex tasks which can take weeks to complete. The ease of setting Aegicem's roof panels, sealing the joints, and applying the roof veneers significantly decreases the time to complete an entire roof. 

  • Only 2 workers needed to complete a roof

  • Designed to complete the roof for a 3000 sqft house in under 3 days

Kitchens & Bathrooms

Aegicem's Kitchen and Bathroom Sets are shipped from the manufacturing facility in pre-assembled packages. This eliminates the need for on-site installation of the individual cabinet sections, countertops, electrical and plumbing, backsplash, and trim.

  • Designed to install the kitchen and 3 bathrooms in a single day

  • Place fully finished kitchen and bathroom sections by knuckle boom

  • All electrical and plumbing is pre-installed with quick-connect couplings

Interior Walls

Framing interior walls and hanging sheetrock is a labor intensive job that takes several weeks to finish. Aegicem has developed a composite interior wall system that eliminates several steps of completing traditionally framed interior walls. Our interior wall system is highly durable, insect proof, waterproof, and fire proof.
 

  • Each of the interior wall sections are designed to be placed and fastened in approximately 10 minutes

  • The interior wall system for a 3000 sqft home is designed to be finished in 3 days or less

bottom of page